


On reinforced footing, the new construction HELICAL PIER Foundation Systems anchors are usually placed every 2.5 to 3.5 metres depending upon the load of the structure and the bearing strength of the soil.
A two man crew with a mini excavator can place over 25 anchors ready for loading in less than one day. Anchors rated by the building codes for working loads of 80 to 150 Kn are typical.
Underpinning using the underpinning support bracket is very good and high cost savings can be achieved in many situations.
See www.abchance.com for further information.